methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper timeline with three dates, parallel lanes for work, signals and decisions, and labeled links.
Facilitation
Timeline
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
When a project, incident, or change process is only remembered in fragments, Timeline brings the sequence back into a readable form. It makes turning points, precursors, and after-effects recognizable over the course of time.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
LowHighMedium
Timedifferent
30-90 min2-6 h1-2 h
Participantsdifferent
2-123-84-12
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Timeline, Milestones, Insight NotesCurrent Reality Tree, Core Problems, Intervention IdeasAlignment Map, Open Issues, Decision Questions
Tagsno overlap
TimelineFacilitationSequence
Systems thinkingRoot causeConstraintsCausality
AlignmentStakeholdersStrategyFacilitation
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Causal Factor Analysis.
Operations
Causal Factor Analysis
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model