View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Time Blocking | ![]() Decision Making Pre-Mortem | ![]() Architecture ARID (Active Reviews for Intermediate Designs) |
|---|---|---|---|
Purposedifferent | With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. |
Complexitydifferent | Low | Low | Medium |
Timedifferent | 15-30 min Planung, laufend | 20–45 min | 2–4 h review as a planning range; preparation and evaluation additional |
Participantsdifferent | 1 | Small cross-functional group | Designers, developers as users, and facilitation |
Formatdifferent | Async | Workshop | Workshop + async |
Outputdifferent | Blocked Calendar, Capacity View, Focus Plan | Risk list, Mitigation plan, Assumption log | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions |
Tagsno overlap | PlanningTime managementFocus | RiskDecisionFailurePlanning | ArchitectureEngineeringFeedbackValidationTasks |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






