methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Gemba Walk workspace showing the question, observations, and next decision.
Operations
Gemba Walk
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions.
Complexitydifferent
LowMediumLow
Timedifferent
15-30 min Planung, laufend30-180 min30-120 min
Participantsdifferent
11-62-6
Formatdifferent
AsyncWorkshop + asyncWorkshop
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanFault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaObservation Notes, Improvement Ideas
Tagsno overlap
PlanningTime managementFocus
TroubleshootingDiagnosisEngineering
LeanObservationProcessOperations
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for ALPEN Method
Operations
ALPEN Method
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration for Hypothesis-Driven Troubleshooting.
Engineering
Hypothesis-Driven Troubleshooting
Paper illustration for Kaizen Event.
Operations
Kaizen Event