View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Delivery RAID Log | ![]() Facilitation Stakeholder Salience Model |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. |
Complexitydifferent | Medium | Low | Medium |
Timedifferent | 10-30 min je Item | 30 min Setup, dann laufend | 60-90 min |
Participantsdifferent | 1-8 | 1-3 maintaining, briefing for everyone | 3-6 |
Formatdifferent | Workshop + async | Async | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | RAID Log, Status Report Source | Salience Diagram, Strategy per Class |
Tagsno overlap | EstimationUncertaintyForecasting | RiskTrackingStakeholdersGovernance | StakeholdersFacilitationAlignmentGovernance |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






