methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumHighHigh
Timedifferent
10-30 min je Item1-5 Tage2-4 h
Participantsdifferent
1-84-123-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesLogic Model, Change Objectives, Intervention Components, Evaluation PlanFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
EstimationUncertaintyForecasting
ChangeSystems thinkingCapability
Theory of ConstraintsSystems thinkingChange
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation