View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Product Discovery Test Card | ![]() Facilitation Decision Jam | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitysame | Low | Low | Low |
Timedifferent | 20-35 min | 60-90 min | 45-90 min |
Participantsdifferent | 1-5 | 4-10 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Test Card with a pre-set threshold | Problem Cluster, Prioritized Challenge, Experiment | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | ExperimentsValidationDiscoveryHypothesis | FacilitationDecisionProblem solvingWorkshop | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






