methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
LowHighHigh
Timedifferent
60–90 minHalf day2-4 h
Participantsdifferent
2-83-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Stakeholder Map, Engagement Plan, Risk NotesLeverage Map, Action StrategyFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tags1 shared
StakeholdersAlignmentFacilitationChange
Systems thinkingChangeStrategy
Theory of ConstraintsSystems thinkingChange
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model