methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration of a branching category tree with a highlighted search path and possible dead ends.
UX Research
Tree Testing
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Purposedifferent
When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.When a navigation exists but search paths still fail, tree testing checks findability without visual distraction. The method shows whether labels, levels, and paths really lead to the intended destination.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.
Complexitydifferent
LowMediumMedium
Timedifferent
20-40 min initial, dann laufend1-2 Tage60-90 min
Participantsdifferent
3-15Based on research question3-6
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
ROAM Board, Owner ListFindability Metrics, Path Analysis, Revised IASalience Diagram, Strategy per Class
Tagsno overlap
RiskAgileTrackingAlignment
Information architectureNavigationFindability
StakeholdersFacilitationAlignmentGovernance
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Stakeholder Mapping
Facilitation
Stakeholder Mapping