View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Decision Making Pre-Mortem | ![]() Operations ALPEN Method |
|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. |
Complexitysame | Low | Low | Low |
Timedifferent | 30-60 min | 20–45 min | 10-20 min daily |
Participantsdifferent | 3-10 | Small cross-functional group | 1 |
Formatdifferent | Workshop + async | Workshop | Async |
Outputdifferent | Risk Matrix, Top Risk List | Risk list, Mitigation plan, Assumption log | Daily Plan, Time Estimates, Review Notes |
Tagsno overlap | RiskDecisionPrioritizationAssessment | RiskDecisionFailurePlanning | PlanningTime managementProductivityOperations |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.