View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Systems Thinking Evaporating Cloud | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Low | Medium | High |
Timedifferent | 30-60 min | 60-120 min | 2-4 h |
Participantsdifferent | 3-10 | 2-8 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Risk Matrix, Top Risk List | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | RiskDecisionPrioritizationAssessment | Theory of ConstraintsAssumptionsSystems thinking | Theory of ConstraintsSystems thinkingChange |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






