View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Facilitation Dot Voting | ![]() Delivery Cost of Delay |
|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. |
Complexitydifferent | Low | Low | High |
Timedifferent | 30-60 min | 5-15 min | 90-180 min |
Participantsdifferent | 3-10 | 3-20 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Risk Matrix, Top Risk List | Ranked list, Consensus signal, Shortlist | CoD Table, Prioritization Sequence |
Tags1 shared | RiskDecisionPrioritizationAssessment | FacilitationVotingConsensusPrioritization | PrioritizationDeliveryEconomicsDecision |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






