View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for ALPEN Method
Operations
ALPEN Method
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitysame
LowLowLow
Timedifferent
30-60 min10-20 min daily20–45 min
Participantsdifferent
3-101Small cross-functional group
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
Risk Matrix, Top Risk ListDaily Plan, Time Estimates, Review NotesRisk list, Mitigation plan, Assumption log
Tagsno overlap
RiskDecisionPrioritizationAssessment
PlanningTime managementProductivityOperations
RiskDecisionFailurePlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay