View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Team Design Team Topologies Interaction Modes | ![]() Business Strategy McKinsey 7S |
|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When several teams collaborate repeatedly, it describes the right interaction mode for each interface between them. It clarifies responsibility, interaction, and load between teams. The result is captured as an interaction heat map and pairwise agreements. | McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result. |
Complexitydifferent | Low | Medium | Medium |
Timedifferent | 30-90 min | Half day | 2-4 h |
Participantsdifferent | 2-10 | Team-Leads plus Architecture | 3-12 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Rich Picture, Problem Framing Notes | Interaction Heat Map, Agreements per Pair | 7S Assessment, Alignment Gaps, Change Actions |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | TeamAlignmentCollaborationOrganization | OrganizationStrategyAlignmentChange |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






