View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Agile Sailboat Retrospective | ![]() Team Design Team Cognitive Load Assessment |
|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture. | When a team juggles too many domains, systems, or handoffs, it measures mental overload as an organizational problem. It clarifies responsibility, interaction, and load between teams. The result is captured as a cognitive-load profile and action list. |
Complexitydifferent | Low | Low | Medium |
Timedifferent | 30-90 min | 45-90 min | 60-90 min |
Participantsdifferent | 2-10 | 4-12 | 3-12 |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | Rich Picture, Problem Framing Notes | Sailboat Board, Risks, Improvement Actions | Cognitive Load Profile, Action List |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | RetrospectiveTeamImprovement | TeamComplexityImprovementDiagnosis |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






