View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery RAID Log | ![]() Decision Making Three-Point Estimation | ![]() Facilitation Power Interest Grid |
|---|---|---|---|
Purposedifferent | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Low | Medium | Low |
Timedifferent | 30 min Setup, dann laufend | 10-30 min je Item | 30-60 min |
Participantsdifferent | 1-3 maintaining, briefing for everyone | 1-8 | 2-8 |
Formatdifferent | Async | Workshop + async | Workshop |
Outputdifferent | RAID Log, Status Report Source | Three-Point Estimate, Risk Range, Assumption Notes | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | RiskTrackingStakeholdersGovernance | EstimationUncertaintyForecasting | StakeholdersFacilitationAlignmentPlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






