View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Operations Fault Tree Analysis | ![]() Systems Thinking Current Reality Tree |
|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once. |
Complexitydifferent | Low | High | High |
Timedifferent | 20–45 min | 2-6 h | 2-6 h |
Participantsdifferent | Small cross-functional group | 3-8 | 3-8 |
Formatdifferent | Workshop | Workshop + async | Workshop |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Current Reality Tree, Core Problems, Intervention Ideas |
Tagsno overlap | RiskDecisionFailurePlanning | RiskRoot causeSafety | Systems thinkingRoot causeConstraintsCausality |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






