methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.
Complexitydifferent
LowHighLow
Timedifferent
20–45 min2-6 h30-60 min
Participantsdifferent
Small cross-functional group3-82-10
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logCurrent Reality Tree, Core Problems, Intervention IdeasIceberg Worksheet, Pattern Notes, Intervention Ideas
Tagsno overlap
RiskDecisionFailurePlanning
Systems thinkingRoot causeConstraintsCausality
Systems thinkingRoot causePatterns
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Theory of Constraints Thinking Process.
Systems Thinking
Theory of Constraints Thinking Process
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration for Behavior Over Time Graph.
Systems Thinking
Behavior Over Time Graph