View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Power Interest Grid | ![]() Facilitation Problem Framing Workshop | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When a team works on symptoms but the real question stays fuzzy, a Problem Framing Workshop sharpens the view of the right problem. It separates observation, interpretation, and target picture from each other. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitysame | Low | Low | Low |
Timedifferent | 30-60 min | 60-120 min | 45-90 min |
Participantsdifferent | 2-8 | 4-10 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | Power Interest Grid, Strategy per Stakeholder | Problem Statement, Scope Boundaries, Assumption List, Next Analysis Questions | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | StakeholdersFacilitationAlignmentPlanning | FacilitationAlignmentDiscovery | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






