methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Polarity Map with two poles and four quadrants
Systems Thinking
Polarity Mapping
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration of a team retrospective with three separate Start, Stop, and Continue areas and a shared action list.
Agile
Start Stop Continue
Purposedifferent
Polarity Mapping makes tensions between two opposing poles tangible, such as standardization and adaptation or control and autonomy. The method guards against making apparent either-or decisions prematurely.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood.
Complexitydifferent
MediumHighLow
Timedifferent
1-2 h2-6 h30-60 min
Participantsdifferent
3-123-83-12
Formatsame
WorkshopWorkshopWorkshop
Outputdifferent
Polarity Map, Warning Signs, Balance ActionsCurrent Reality Tree, Core Problems, Intervention IdeasStart Stop Continue Board, Improvement Actions
Tagsno overlap
Systems thinkingTradeoffsLeadership
Systems thinkingRoot causeConstraintsCausality
RetrospectiveImprovementTeamReflection
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
Paper illustration for Starfish Retrospective
Agile
Starfish Retrospective