View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations PDCA Cycle | ![]() Product Discovery Smoke Test | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|
Purposedifferent | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When demand only needs to be roughly verified, it tests interest with minimal effort. It measures whether people would take a next step at all. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Low | Medium |
Timedifferent | 1 h bis mehrere Wochen | 1-5 Tage | 45-60 min |
Participantsdifferent | 1-8 | Nutzertraffic | 2-8 |
Formatdifferent | Workshop + async | Async | Workshop + async |
Outputdifferent | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Interest Metrics, Conversion Signal, Learning Note | Assumption map, Test backlog, Risk ranking |
Tags1 shared | Continuous improvementLeanExperiments | ValidationExperimentsDemandGrowth | AssumptionsRiskExperimentsValidation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






