View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile Mad Sad Glad | ![]() Systems Thinking Rich Picture | ![]() Facilitation Expectation Mapping |
|---|---|---|---|
Purposedifferent | When a team's or workshop's mood needs to become readable, it structures emotional signals with little setup. It makes strain, relief, and sources of energy tangible. | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge. |
Complexitysame | Low | Low | Low |
Timedifferent | 30-60 min | 30-90 min | 45-90 min |
Participantsdifferent | 3-10 | 2-10 | 3-12 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Emotion Board, Themes, Action Items | Rich Picture, Problem Framing Notes | Expectation Map, Alignment Notes, Agreements |
Tagsno overlap | RetrospectiveTeamReflection | Systems thinkingSoft systemsFramingVisualization | AlignmentStakeholdersTeam |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






