methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Kano Model with its core stages and visible working result.
Product Discovery
Kano Model
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When features need to be distinguished by their effect on satisfaction, it makes expectations and surprises comparable. It separates basic needs, performance contribution, and delight.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
MediumMediumLow
Timedifferent
1-2 Tage30-90 min20–45 min
Participantsdifferent
10-501-6Small cross-functional group
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kano Matrix, Feature Classes, Priority ThemesDecision Tree, Option Map, Assumption ListRisk list, Mitigation plan, Assumption log
Tagsno overlap
SatisfactionPrioritizationCustomer
DecisionTreeOptions
RiskDecisionFailurePlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay