methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
MediumLowLow
Timedifferent
Ongoing30 min Setup, dann laufend20–45 min
Participantsdifferent
2-121-3 maintaining, briefing for everyoneSmall cross-functional group
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsRAID Log, Status Report SourceRisk list, Mitigation plan, Assumption log
Tagsno overlap
FlowVisual managementDelivery
RiskTrackingStakeholdersGovernance
RiskDecisionFailurePlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Communication Plan
Delivery
Communication Plan
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay