View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Systems Thinking Evaporating Cloud | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | 0.5-5 Tage | 60-120 min | 45-90 min |
Participantsdifferent | 4-10 | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | LeanContinuous improvementOperations | Theory of ConstraintsAssumptionsSystems thinking | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






