methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of an IBIS map with issues, positions and arguments
Knowledge Modeling
IBIS
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
IBIS structures thinking about complex questions as a sequence of issues, ideas, and arguments. The method keeps discussions open without forcing them into premature consensus.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumLow
Timedifferent
1-3 h1-3 Tage30-60 min
Participantsdifferent
2-81-42-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Issue Map, Positions, Argument NotesArchitecture Views, Cross-view Notes, RationalePower Interest Grid, Strategy per Stakeholder
Tagsno overlap
RationaleKnowledgeDecision
DocumentationStakeholdersArchitecture
StakeholdersFacilitationAlignmentPlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model