View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Futures Wheel | ![]() Operations PDCA Cycle | ![]() Growth A/B Testing |
|---|---|---|---|
Purposedifferent | The Futures Wheel helps explore the consequences of a decision, a trend, or a strategic move in a structured way. It makes visible which first, second, and third-order effects could arise from an event. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. |
Complexitydifferent | Medium | Low | High |
Timedifferent | 60-120 min | 1 h bis mehrere Wochen | 1-4 Wochen |
Participantsdifferent | 3-10 | 1-8 | 1-6 |
Formatdifferent | Workshop + async | Workshop + async | Async |
Outputdifferent | Futures Wheel, Consequence Chains, Strategic Signals | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Experiment results, Decision log, Learning summary |
Tagsno overlap | ForesightSystems thinkingSignals | Continuous improvementLeanExperiments | ExperimentsGrowthAnalyticsValidation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






