View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Facilitation Team Charter | ![]() Systems Thinking Evaporating Cloud |
|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When a team is starting fresh or working past each other, Team Charter clarifies the shared working basis. It visibly sets out how collaboration, decision paths, and mutual conduct should work day to day. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. |
Complexitydifferent | High | Medium | Medium |
Timedifferent | 2-4 h | 2-4 h | 60-120 min |
Participantsdifferent | 3-8 | 3-12 | 2-8 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Team Charter, Working Norms, Role Notes | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | TeamAlignmentCollaboration | Theory of ConstraintsAssumptionsSystems thinking |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






