View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Leverage Points | ![]() Business Strategy McKinsey 7S |
|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. | McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result. |
Complexitydifferent | High | High | Medium |
Timedifferent | 2-4 h | Half day | 2-4 h |
Participantsdifferent | 3-8 | 3-12 | 3-12 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Leverage Map, Action Strategy | 7S Assessment, Alignment Gaps, Change Actions |
Tags1 shared | Theory of ConstraintsSystems thinkingChange | Systems thinkingChangeStrategy | OrganizationStrategyAlignmentChange |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






