methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Five-Minute VC Check with its method-specific working model.
Business Strategy
5-Minuten VC-Check
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
The 5-Minute VC Check clarifies opportunities and strategic options at the earliest idea stage. It compares problem quality, customer willingness to pay, alternatives, differentiation, and market potential, and captures the result as a VC-check note, go/sharpen/park decision, and risk list.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitysame
LowLowLow
Timedifferent
5-15 min60-90 min15-45 min
Participantsdifferent
1-54-121-3
Formatdifferent
Workshop + asyncWorkshopAsync
Outputdifferent
VC-check note, Go/sharpen/park decision, Risk and assumption list, Next validation stepAnnotated Diagram, Prioritized Risk List, Action BacklogADR File, Decision Log, Rationale
Tagsno overlap
StartupValidationCompetition
RiskArchitectureWorkshopValidation
ArchitectureRationaleDocumentationGovernance
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)