View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fault Tree Analysis | ![]() Product Discovery Riskiest Assumption Test | ![]() Innovation Design Sprint |
|---|---|---|---|
Purposedifferent | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. |
Complexitydifferent | High | Medium | High |
Timedifferent | 2-6 h | 1-2 Wochen pro Iteration | 4-5 Tage |
Participantsdifferent | 3-8 | 2-6 | 5-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Prioritized Assumption List, Test Plan, Results Report | Prototype, Test Findings, Decision Rationale |
Tagsno overlap | RiskRoot causeSafety | ExperimentsValidationDiscoveryAssumptions | Design sprintPrototypeValidationInnovation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






