View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fault Tree Analysis | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Operations Barrier Analysis |
|---|---|---|---|
Purposedifferent | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. |
Complexitydifferent | High | Medium | Medium |
Timedifferent | 2-6 h | 2–4 h review as a planning range; preparation and evaluation additional | 2-4 h |
Participantsdifferent | 3-8 | Designers, developers as users, and facilitation | 2-6 |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Barrier Inventory, Failure Analysis per Barrier, Action Backlog |
Tagsno overlap | RiskRoot causeSafety | ArchitectureEngineeringFeedbackValidationTasks | Root causeSafetyIncident |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






