View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Decision Making Pre-Mortem | ![]() Facilitation Decision Jam |
|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. |
Complexitydifferent | Medium | Low | Low |
Timedifferent | 30-180 min | 20–45 min | 60-90 min |
Participantsdifferent | 1-6 | Small cross-functional group | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Risk list, Mitigation plan, Assumption log | Problem Cluster, Prioritized Challenge, Experiment |
Tagsno overlap | TroubleshootingDiagnosisEngineering | RiskDecisionFailurePlanning | FacilitationDecisionProblem solvingWorkshop |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






