methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration of an IBIS map with issues, positions and arguments
Knowledge Modeling
IBIS
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.IBIS structures thinking about complex questions as a sequence of issues, ideas, and arguments. The method keeps discussions open without forcing them into premature consensus.
Complexitydifferent
MediumLowMedium
Timedifferent
30-180 min60-90 min1-3 h
Participantsdifferent
1-64-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + async
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaProblem Cluster, Prioritized Challenge, ExperimentIssue Map, Positions, Argument Notes
Tagsno overlap
TroubleshootingDiagnosisEngineering
FacilitationDecisionProblem solvingWorkshop
RationaleKnowledgeDecision
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Hypothesis-Driven Troubleshooting.
Engineering
Hypothesis-Driven Troubleshooting
Paper illustration for Argument Mapping
Decision Making
Argument Mapping
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe