methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of shared options, independently placed voting dots, and a highlighted shortlist.
Facilitation
Dot Voting
Paper illustration for Risk Storming.
Architecture
Risk Storming
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
LowLowMedium
Timedifferent
5-15 min60-90 min2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
3-204-12Designers, developers as users, and facilitation
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Ranked list, Consensus signal, ShortlistAnnotated Diagram, Prioritized Risk List, Action BacklogPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
FacilitationVotingConsensusPrioritization
RiskArchitectureWorkshopValidation
ArchitectureEngineeringFeedbackValidationTasks
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Independent contributions form an ordered group priority list.
Facilitation
Nominal Group Technique
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)