methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of shared options, independently placed voting dots, and a highlighted shortlist.
Facilitation
Dot Voting
Independent contributions form an ordered group priority list.
Facilitation
Nominal Group Technique
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection.When loud voices could dominate a round, Nominal Group Technique protects individual thinking time from group effects. It collects ideas separately first and only then enables shared weighting.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
LowMediumLow
Timedifferent
5-15 min60-120 min30-60 min
Participantsdifferent
3-205-123-10
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Ranked list, Consensus signal, ShortlistRanked Ideas, Clarified Options, Group PriorityRisk Matrix, Top Risk List
Tags1 shared
FacilitationVotingConsensusPrioritization
FacilitationPrioritizationVotingInclusion
RiskDecisionPrioritizationAssessment
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for 1-2-4-All.
Facilitation
1-2-4-All
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay