View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Operations Waste Analysis | ![]() Operations Standard Work Analysis |
|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. |
Complexitydifferent | High | Low | Medium |
Timedifferent | 2-12 Wochen | 45-120 min | 1-3 h |
Participantsdifferent | 3-10 | 2-8 | 2-6 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Waste Map, Prioritized Waste, Improvement Backlog | Standard Work Sheet, Deviation List, Improved Standard, Training Needs |
Tagsno overlap | Continuous improvementQualityProcess improvement | WasteLeanProcess improvement | LeanProcessQuality |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






