View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Delivery RAID Log | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | High | Low | Low |
Timedifferent | 2-12 Wochen | 30 min Setup, dann laufend | 45-90 min |
Participantsdifferent | 3-10 | 1-3 maintaining, briefing for everyone | 2-8 |
Formatdifferent | Workshop + async | Async | Workshop + async |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | RAID Log, Status Report Source | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | Continuous improvementQualityProcess improvement | RiskTrackingStakeholdersGovernance | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






