View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Design Thinking | ![]() Product Discovery Assumption Mapping | ![]() Operations Fault Tree Analysis |
|---|---|---|---|
Purposedifferent | For complex user problems with an uncertain cause, the method connects observation, interpretation, and experiment into a learning cycle. It keeps the focus on real needs and avoids premature solution language. This produces robust decisions for product and service. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. |
Complexitydifferent | High | Medium | High |
Timedifferent | 1 Tag bis mehrere Wochen | 45-60 min | 2-6 h |
Participantsdifferent | 4-10 | 2-8 | 3-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Problem Statement, Prototype, Test Learnings | Assumption map, Test backlog, Risk ranking | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions |
Tagsno overlap | InnovationPrototypeResearch | AssumptionsRiskExperimentsValidation | RiskRoot causeSafety |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






