View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Design Sprint | ![]() Product Discovery Solution Interview | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When a solution idea is already on the table, it checks how it is understood and evaluated. It looks for resonance, objections, and missing fit early in the conversation. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | High | Medium | Low |
Timedifferent | 4-5 Tage | 30-60 min je Interview | 45-90 min |
Participantsdifferent | 5-8 | 5-10 Interviews | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Prototype, Test Findings, Decision Rationale | Solution Feedback, Objection List, Validation Notes | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | Design sprintPrototypeValidationInnovation | ValidationInterviewsPrototype | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






