View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Design Sprint | ![]() Decision Making Risk Matrix | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|
Purposedifferent | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | High | Low | Medium |
Timedifferent | 4-5 Tage | 30-60 min | 45-60 min |
Participantsdifferent | 5-8 | 3-10 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Prototype, Test Findings, Decision Rationale | Risk Matrix, Top Risk List | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | Design sprintPrototypeValidationInnovation | RiskDecisionPrioritizationAssessment | AssumptionsRiskExperimentsValidation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






