methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighLowMedium
Timedifferent
4-5 Tage30 min Setup, dann laufend45-60 min
Participantsdifferent
5-81-3 maintaining, briefing for everyone2-8
Formatdifferent
WorkshopAsyncWorkshop + async
Outputdifferent
Prototype, Test Findings, Decision RationaleRAID Log, Status Report SourceAssumption map, Test backlog, Risk ranking
Tagsno overlap
Design sprintPrototypeValidationInnovation
RiskTrackingStakeholdersGovernance
AssumptionsRiskExperimentsValidation
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of Riskiest Assumption Test with a method-specific labelled workspace.
Product Discovery
Riskiest Assumption Test
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)