View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making DACI | ![]() Systems Thinking Future Reality Tree | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|
Purposedifferent | In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | High | Medium |
Timedifferent | 30-60 min | 2-4 h | 45-60 min |
Participantsdifferent | 2-10 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | DACI Matrix, Decision Owner, Decision Log | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | DecisionRolesGovernanceAlignment | Theory of ConstraintsSystems thinkingChange | AssumptionsRiskExperimentsValidation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






