View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Cost of Delay | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|
Purposedifferent | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitysame | High | High | High |
Timedifferent | 90-180 min | 2-4 h | 1-5 Tage |
Participantsdifferent | 3-8 | 3-8 | 4-12 |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | CoD Table, Prioritization Sequence | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | PrioritizationDeliveryEconomicsDecision | Theory of ConstraintsSystems thinkingChange | ChangeSystems thinkingCapability |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






