View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking CATWOE Analysis | ![]() Delivery Cost of Delay | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | High | Low |
Timedifferent | 45-90 min | 90-180 min | 45-90 min |
Participantsdifferent | 3-8 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | CATWOE Canvas, Root Definition, Stakeholder Perspectives, Constraints | CoD Table, Prioritization Sequence | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | Systems thinkingFramingStakeholders | PrioritizationDeliveryEconomicsDecision | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






