View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture C4 Model | ![]() Facilitation Power Interest Grid | ![]() Decision Making Pre-Mortem |
|---|---|---|---|
Purposedifferent | The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitysame | Low | Low | Low |
Timedifferent | 1-4 h | 30-60 min | 20–45 min |
Participantsdifferent | 1-5 | 2-8 | Small cross-functional group |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Context Diagram, Container Diagram, Component Diagram | Power Interest Grid, Strategy per Stakeholder | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | ArchitectureCommunicationVisualization | StakeholdersFacilitationAlignmentPlanning | RiskDecisionFailurePlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






