View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Decision Making Risk Matrix | ![]() Operations ABC Analysis |
|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. |
Complexitysame | Low | Low | Low |
Timedifferent | 45-90 min | 30-60 min | 30-60 min |
Participantsdifferent | 2-8 | 3-10 | 1-5 |
Formatdifferent | Workshop + async | Workshop + async | Async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Risk Matrix, Top Risk List | ABC Classification, Focus Rules, Control List |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | RiskDecisionPrioritizationAssessment | PrioritizationOperationsPortfolio |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






