View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Facilitation Decision Jam | ![]() Product Discovery Test Card |
|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. |
Complexitysame | Low | Low | Low |
Timedifferent | 45-90 min | 60-90 min | 20-35 min |
Participantsdifferent | 2-8 | 4-10 | 1-5 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Problem Cluster, Prioritized Challenge, Experiment | Test Card with a pre-set threshold |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | FacilitationDecisionProblem solvingWorkshop | ExperimentsValidationDiscoveryHypothesis |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






