View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Delivery Cost of Delay | ![]() Decision Making Pre-Mortem |
|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Low | High | Low |
Timedifferent | 45-90 min | 90-180 min | 20–45 min |
Participantsdifferent | 2-8 | 3-8 | Small cross-functional group |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | CoD Table, Prioritization Sequence | Risk list, Mitigation plan, Assumption log |
Tags1 shared | AssumptionsRiskDecisionDiscovery | PrioritizationDeliveryEconomicsDecision | RiskDecisionFailurePlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.