View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Delivery Cost of Delay | ![]() Innovation Design Thinking |
|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | For complex user problems with an uncertain cause, the method connects observation, interpretation, and experiment into a learning cycle. It keeps the focus on real needs and avoids premature solution language. This produces robust decisions for product and service. |
Complexitydifferent | Low | High | High |
Timedifferent | 45-90 min | 90-180 min | 1 Tag bis mehrere Wochen |
Participantsdifferent | 2-8 | 3-8 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | CoD Table, Prioritization Sequence | Problem Statement, Prototype, Test Learnings |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | PrioritizationDeliveryEconomicsDecision | InnovationPrototypeResearch |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






