View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Product Discovery Assumption Mapping | ![]() Decision Making Risk Matrix | ![]() Knowledge Modeling Concept Mapping |
|---|---|---|---|
Purposedifferent | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | Concept Mapping arranges terms and relationships in a network that makes subject-matter connections tangible. It fits when a topic needs to be understood structurally rather than linearly. |
Complexitydifferent | Medium | Low | Medium |
Timedifferent | 45-60 min | 30-60 min | 1-2 h |
Participantsdifferent | 2-8 | 3-10 | 1-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Assumption map, Test backlog, Risk ranking | Risk Matrix, Top Risk List | Concept Map, Relationship Labels, Knowledge Gaps |
Tagsno overlap | AssumptionsRiskExperimentsValidation | RiskDecisionPrioritizationAssessment | KnowledgeConceptsMappingSensemaking |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






